City of Piedmont Roads Projects Page

Welcome to the City of Piedmont’s Road Projects Page. The information displayed on this page will be dedicated specifically towards the roads maintenance operations and future planning for roads infrastructure within Piedmont city limits.

This will be updated with information on grants, weekly maintenance, work orders, road conditions, short term and long term roads projects.

The Road Bond Committee has worked to create a five-year improvement plan. This included a scoring criteria and research regarding usage. Please click here to view this plan. 

Road Closures & Construction Updates

Latest Roads Project News;

Piedmont Public Works - Pothole Patching (01/20/19 - 01/24/2020)

Pothole patching is limited this week due to meter reads.

  • Morgan Rd. from Edmond Rd. (178th) to Apache (206th)
  • Intersection of Monroe & Piedmont Rd.

Piedmont Public Works - Road Grading (01/20/19 - 01/24/2020)

No road grading this week due to meter reads.

Piedmont Public Works - Pothole Patching (01/13/19 - 01/17/2020)

  • Arrowhead / 192nd between Morgan and Sarah Rd.
  • Shoulders on Sara Rd. from Edmond Rd. 178th to Arrowhead 192nd
  • Linton Ln.
  • Terrace Hills entryway repair patch; saw-cut, demo, extraction, base stabilization.
  • Terrace Hills entryway repair patch; crusher, tac & asphalt.
  • 1/16/20 NO PATCHING – Rain
  • 1/17/20 NO PATCHING – Rain & Meter Reads Begin

Piedmont Public Works - Road Grading (01/13/19 - 01/17/2020)

  • 1/13/20 OPERATOR OUT
  • 1/14/20 – 1/15/20 Operator assisted with Terrace Hills entryway repairs.
  • 1/16/20 NO GRADING – Rain
  • 1/17/20 NO GRADING – Rain & Water Meter Reads Starting (see misc.)

Piedmont Public Works - Pothole Patching (01/06/19 - 01/10/2020)

  • Washington 164th & Mustang
  • Rolling Hills neighborhood.
  • Piedmont Rd. 192nd to 220th
  • Van Buren NE (Rolling Prairie)
  • Badger St. (Rolling Prairie)
  • Waterloo Rd. Cracks on shoulder E. of Reading Rd. (2940 Rd.)

Piedmont Public Works - Road Grading (01/06/19 - 01/10/2020)

  • Mustang Rd. from Arrowhead 192nd to Waterloo 248th
  • Moffat 234th Mustang to Piedmont Rd.
  • Richland from Washington 164th to Arrowhead 192nd 
  • Edmond Rd. 178th from Cemetery to Frisco
  • Cemetery Rd. from Moffat 234th to Edmond Rd. 178th
  • NO GRADING – OTHER PROJECTS (See Misc. Updates)
  • Richland from Arrowhead 192nd to Waterloo 248th.
  • N/A – Water Leaks

Piedmont Public Works - Pothole Patching (12/30/19 - 01/03/2020)

  • OFF - New Years Holiday 01/01/20
  • Waterloo Rd. Cracks on shoulder E. of Reading Rd. (2940 Rd.)
  • Waterloo Rd. patching potholes E. of Piedmont Rd.
  • Western side of the Downtown Piedmont Area;
  • NW Madison Ave
  • NW 1st St.
  • NW 2nd St.
  • Jackson Ave NW
  • Monroe Ave NW

Piedmont Public Works - Road Grading (12/30/19 - 01/03/2020)

  • Grader Operator OFF – HOLIDAY VACATION REQUEST (12/23/19-1/1/2020)
  • Graded Sara Rd. 192 – 206th 
  • Graded 192nd from Piedmont Rd. to County Line Rd.

Piedmont Public Works - Pothole Patching (12/23/19 - 12/27/2019)

  • Jefferson Ave NE
  • Madison Ave NE
  • Monroe Ave NE
  • 1st St. NE
  • 2nd St. NE
  • 3rd St. NE

Piedmont Public Works - Pothole Patching (12/16/19 - 12/20/2019)

Pothole patching is limited this week due to meter reads.

  • Continued patching of Van Buren.

Piedmont Public Works - Road Grading (12/16/19 - 12/20/2019)

No road grading this week due to meter reads.

Piedmont Public Works - Pothole Patching (12/09/19 - 12/13/2019)

  • Ash NE (220th) from Piedmont Rd. N., East to County Line Rd.
  • Moffat (234th) from Frisco to Cemetery
  • Moffat (234th) from Mustang to Sara Rd.

Piedmont Public Works - Road Grading (12/09/19 - 12/13/2019)

  • Training Opportunity with Canadian County;
  • Worked with Canadian County District 1 in creating a training initiative for our Grader Operator. Canadian County sent up one of their experienced operators to do live training on-site of City roadways on the dates of 12/11/19 and 12/12/19. (Wednesday and Thursday).
  • Using two graders, a total of 19 of our 23 miles of gravel roads were during the week of 12/9/19 - 12/13/19
  • Our operator learned many valuable skills in identifying and remedying problematic and potentially problematic areas for preventative road maintenance and rehabilitation.
  • You will see a vast improvement of the quality and conditions of our gravel roads.
  • Due to the condition that many of our gravel roads are in, it will take time to rehabilitate them up to standard.

Piedmont Public Works - Pothole Patching (12/02/19 - 12/06/2019)

  • Terrace Hills
  • Terry Ln.
  • Ash (220th) from Piedmont Rd. Eastbound to County Line Rd. (Incomplete)

Piedmont Public Works - Road Grading (12/02/19 - 12/06/2019)

  • Graded Cemetery Rd. South of low water crossing to 192nd.
  • Hauled shale material to fill large washout areas and potholes.
  • Graded Richland Rd., shale and gravel material is needed at this section of road.
  • Applied 1 ½” gravel and shale material, graded Cemetery Rd. South of low water crossing, between Apache (206th) and Moffat (234th).
  • Applied shale delivered on site, gravel and graded Sara Rd. from Apache (192nd ) to (206th).
    • Ruts bladed and crossing rehabilitated.
  • Continued grade work on Sara Rd.

Piedmont Public Works - Pothole Patching  (11/25/19 - 11/29/2019)

  • Patched Apache (206th) West of Piedmont Rd.
  • Patched Duboise.
  • Patched Andy Ave.
  • Patched entry to Van Buren (not entire street)
  • Patched Apache (206th) East of Piedmont Rd. to Sara.
  • Patched Ash (220th) East of Piedmont Rd. to Mustang.
  • Patched Ash (220th) from Sara to Morgan Rd.
  • Patched Horsehoe Bend.
  • Patched Bridal Path.

Piedmont Public Works - Road Grading (11/25/19 - 11/29/2019)

  • Applied shale, gravel and graded Sara Rd. from Apache (206th ) to (220th).
  • Applied gravel and graded Cemetery Rd. N. of low water crossing, between Apache (206th) and Moffat (234th)
    • Ruts bladed and crossing rehabilitated.
    • 250 Tons 5/8” crusher delivered on site.
  • Graded Arrowhead from Sara Rd. to County Line Rd.

Piedmont Public Works - Pothole Patching  (11/18/19 - 11/22/2019)

Pothole patching is limited this week due to meter reads.

  • Potholes have been focused on this week at the following locations;
  • 11/18/19 Frisco Rd. 164th to 192nd.
  • Patched potholes at both Circle V entrances.
  • Patched potholes at entrance to Horseshoe Bend (off 192nd).

Piedmont Public Works - Road Grading  (11/18/19 - 11/22/2019)

No road grading this week due to meter reads

Piedmont Public Works - Pothole Patching  (11/12/19 - 11/15/2019)

Potholes have been focused on this week at the following locations;

  • Every Ave.
  • Washington (164th) West of School.
  • Continued Patching of Washington (164th) West of School to Cimarron.
  • Patched at Frisco & Washington (164th)
  • Continued patching northbound Frisco from Washington (164th) to Apache (206th)

Piedmont Public Works - Road Grading (11/12/19 - 11/15/2019)

Road Grading Maintenance has been completed on the following roads;

  • Graded and smoothed out Moffat (234th)
  • Revisited Moffat (234th) again to correct shoulder error.
  • Graded Sara Rd. from Arrowhead 192nd to Waterloo 248th
    • Hauled in 8 loads of shale to fix low spots, wash boarding, and large potholes.

Misc. Road Maintenance (11/12/19 - 11/15/2019)

  • 8 haul shale dropped at Sara Rd. for maintenance work on 11/15/19
  • 3 haul shale dropped at Arrowhead (192nd) & County Line Washout
  • 4” Rip Rap Material Delivered to Street Barn
    • This will be used for erosion mitigation in misc. areas around town.
  • City of Norman hosted H.D. Industries Pro Patch Truck live patching demonstration for Piedmont City Council at the City of Norman Streets Department Offices.

Piedmont Public Works - Pothole Patching  (11/04/19 - 11/08/2019)

Potholes located on the following roads have been focused this week;

  • Mustang Rd. 164th – 178th
  • Mustang Rd. 178th-192nd
  • Piedmont Rd. 178-220th
  • Piedmont Rd. 220th – 234th

Piedmont Public Works - Road Grading (11/04/19 - 11/08/2019)

  • Sara Rd. 248th – 192nd 

Misc. Road Maintenance (11/04/19 - 11/08/2019)

  • Road drainage on Taylor Ave. was fixed 11/5/19.
  • Laid and smoothed out gravel material to fix shoulder and lane erosion.

Piedmont Public Works - Pothole Patching  (10/28/19 - 11/01/2019)

Potholes located on the following roads have been focused this week;

  • Potholes located on the following sections focused this week;
  • Piedmont Rd. from Edmond Rd. NE (178th) to Moffat (234th)
  • Mustang Rd. from Washington (164th) to Edmond Rd. NE (178th)
  • Waterloo West of Piedmont Rd. (Large square hole.)
  • Appears to have been a mudflap leftover during the construction of the road causing this issue.

Piedmont Public Works - Road Grading  (10/28/19 - 11/01/2019)

Maintenance has been completed to the following roads;

  • Graded Sara Rd. from Waterloo (248th ) South to Moffat (234th)
    • Shale and gravel material is needed.
  • Graded & applied shale material to Mustang Rd. from Waterloo (248th) south to Apache (206th)

Piedmont Public Works - Pothole Patching  (10/21/19 - 10/25/2019)

Potholes located on the following roads have been focused this week;

  • Large section of Edmond Rd. NW starting from Golden Hills neighborhood and ending at High School entryway.
    • Saw-cut, peel shoulders, open drainage for flow off of road surface, demo of existing road, rolled base, laid shale, rolled, laid 1 ½ crusher, rolled, applied tack / emulsion and laid 3” type-c of asphalt.
    • Misc patching continued with leftover material on Edmond Rd.
  • Patched WildCat Way entry.
    • This area needs much more material and we were unable to bring in the amount of material needed due to not having a 8-10YD dumptruck.
    • Recommended that school reconstructs entryway using concrete.

Piedmont Public Works - Pothole Patching  (10/14/19 - 10/18/2019)

  • Site prep & drainage work performed on Edmond Rd. NW from Golden Hills to Stout.

Piedmont Public Works - Misc. Road Maintenance  (10/07/19 - 10/11/2019)

Culvert Maintenance;

  • Drainage maintenance on Arrowhead (192nd) .5 mi East of Morgan.
  • Crews installed (2) 18” tin-horns and opened up ditches to alleviate washout issues.
  • Applied shale material, compacted by roller, and bladed over for smooth crossing.
  • Grader work applied to finalize surfacing.

Piedmont Public Works - Road Grading  (10/07/19 - 10/11/2019)

Maintenance has been completed to the following roads;

  • Cemetery Rd. from Apache (206th ) to Moffat (234th)
  • Frisco Rd. from Piedmont RV Park (.5 mi S of Moffat 234th) to Waterloo (248th)
  • Arrowhead (192nd ) from Mustang to Morgan Rd.

Piedmont Public Works - Pothole Patching  (10/07/19 - 10/11/2019)

Potholes located on the following roads have been filled and tampered;

  • Mustang Rd. & Apache (206th )

Piedmont Public Works - Pothole Patching  (9/30/19 - 10/04/2019)

Potholes located on the following roads have been focused this week;

  • Arrowhead (192nd) Frisco to Piedmont Rd.
  • Apache (206th) Piedmont Rd. to Morgan
  • Morgan Rd. from Apache (206th) to Edmond Rd. (178th)
  • Mustang & Washington (164th) intersection.
  • Skyline Estates neighborhood; (Candice Dr. NW, Carrie Ln, Misty Dr. NW)
  • Jefferson Ave NE
  • Jackson Ave NE

Patching this week comes to a total of approximately 5.5 miles

Piedmont Public Works - Road Grading  (9/30/19 - 10/04/2019)

Maintenance has been completed to the following roads.

  • Richland Rd. from Arrowhead (192nd) to Washington (164th)
  • Graded washout on Arrowhead (192nd) East of Morgan Rd.
    • Reported by Fire Dept. that emergency vehicles would be unable to cross in the case of rain. Addressed situation same day.
    • Applied shale material, compact, and bladed over for smooth crossing.
      • 2 x 18” tin-horns to alleviate drainage issues will be installed once more material arrives.

Piedmont Public Works - Road Grading  (9/23/19 - 9/27/2019)

Maintenance has been completed to the following roads.

  • Arrowhead (192nd) from Richland Rd. NW to Cimarron Rd. NW
  • Cimarron Rd. NW from Ash (220th) to Apache (206th)
  • Richland Rd. NW from Ash (220th) to Apache (206th)
  • Richland Rd. NW from Arrowhead (192nd) to Edmond Rd. NW (178th)
  • Richland Rd. NW from Edmond Rd. NW (178th) to Washington (164th)

There are areas on a majority of these roads that are in need of materials such as shale and crusher (gravel). These areas will be addressed and revisited once material is purchased.

Piedmont Public Works - Pothole Patching  (9/16/19 - 9/20/2019)

Potholes located on Apache (206th) from Frisco to N. Piedmont Rd. (Including subsidiary roads; Hart Rd., Fina Rd.) were filled and tamped.

  • Monday, 9/16/19 was the only day patching crews did not operate. Hands were needed to do meter reads.

Piedmont Public Works - Pothole Patching  (9/9/19 - 9/13/2019)

Potholes located on Moffat (234th) stretching from Frisco to Richland have been largely focused this week. Crews are about 95% finished with this stretch and have been held back from continuing due to Thursday nights rain.

After finishing Moffat (234th), crews will be moving to Apache (206th) from Frisco to N. Piedmont Rd.

Piedmont Public Works - Road Grading  (9/9/19 - 9/13/2019)

Maintenance has been completed to the following roads.

  • Arrowhead (192nd) from N. Piedmont Rd. to Mustang Rd.
  • Mustang Rd. from Waterloo (248th) to Arrowhead (192nd)
  • Sara Rd. from Waterloo (248th) to Arrowhead (192nd)

Mustang Rd. and Sara Rd. still have areas that will need materials such as 1 & 1/2" crusher and shale applied. It will be a few weeks before we can get these materials in and finish dressing the roads.

Maintenance of Sara Rd. Between Washington (164th) & Edmond Rd. (178th) 

  • Problematic locations will be addressed just south of the intersection of Sara Rd. & 178th near the bridge. Conditions are the entire width of the road. Road will be impassable during time of maintenance.
  • Road opened to through traffic on August 7th, 2019.
  • Single lane closures will remain until rest of road has been addressed.
  • Roadwork is under warranty and is being completed at no cost to the city.Sara Rd. Repairs
    • Full depth repair; saw-cut, 10” excavation, 6” agg base type A then 4” S4 asphalt.
    • Chip seal repair; apply CRS-2S at 0.20 gal/sy then 3/8” washed rock at 14 lbs/sy.
  • Project Start Date; July 29th, 2019 @ 9:00am

Washout Repairs on 234th between Cemetery & Frisco Rd.

  • Pre-Bid Meeting July 2nd, 2019 at City Hall.
  • Sealed Bid Opening July 12th, 2019 at City Hall.
  • Project begin date; August 19th, 2019.
  • Completion time is estimated for 3-4 weeks, pending weather.
  • Beginning of construction will require water to be shut off in the area for an approximated 1hr timeline.
  • Council is set to vote on the approval of an agreed upon bid July 22nd, 2019.
  • Apprx. Cost; $114,000.00

Washout Repairs on Cemetery Rd. halfway between Apache & Moffat

  • Project estimated begin date; July 12th, 2019 - July 13th, 2019
  • Completion time is estimated for September 1st, pending weather.
  • Contract awarded to Kudron Concrete & Construction Co., L.C. by City Council on June 24th, 2019.
  • Equipment, material, and labor to construct concrete low water crossing, excavate existing tinhorn & debris, grade to subgrade.
  • Total Cost: $32,800.00

Latest Roads Project Completed;

Urgent Maintenance of N. Piedmont Rd. Between Ash/220th & Moffat/234th 

  • Completed July 22nd, 2019
  • N. Piedmont Rd. Between Ash/220th & Moffat/234th will be closed to through traffic on Monday July 22nd, 2019 for urgent road maintenance
  • Completion time is estimated for the evening of Monday July 22nd, 2019.
  • Detour signage will be in place to provide alternative routes.
  • Project Start Date; July 22nd, 2019
  • Apprx. Cost; Costs will be posted here once obtained.

Andy Ave. Grading

  • Completed July 2nd, 2019
  • Graded out the washed road.
  • Crew has applied 82.5 tons of 1 1/2" crusher
  • Apprx. Cost; $2,300.00

Asphalt Work on Morgan Rd. 178th - 206th

  • Patched existing road from Edmond Rd. North to Kansas Cemetery North of 192nd Street.
  • 90.62 tons of Type C Asphalt
  • Total Cost; $13,593.00

Meadowlark Lane - West of Mustang Rd.

  • Completed by Kudron Concrete & Construction Co., L.C. July 1st, 2019
  • Grinding existing surface and resurfacing with gravel.
  • Total Cost; $12,959.00

Proposed Roads Projects;

Waterloo / 248th 1 Mile West of Piedmont Rd.

  • ProSeal Reclamite application for pavement preservation.
  • Restoring of key components of asphalt, reverse oxidation & aging issues, preserve road & prevent cracking.
  • Apprx. Cost; $15,000.00

Mustang Road between 164th (Washington) & 178th (Edmond Rd.)

  • Surveying has been completed.
  • Base modification, drainage structure, and resurfacing.
  • Apprx. Cost; $300,000.00-$325,000.00
  • Drainage work is set to begin early spring.
  • Surface and base modification is intended to be done late Spring of 2020.

Edmond Rd. Between Frisco and Western Municipal Boundary

  • Bar ditch excavation and resurfacing with gravel.
  • Apprx. Cost; $75,000.00 - $100,000.00

If you have any questions or concerns regarding roads, please call City Hall at 405-373-2621 or send an email to avossen@piedmont-ok.gov