City of Piedmont Roads Projects Page

Welcome to the City of Piedmont's Road Projects Page. The information displayed on this page will be dedicated specifically towards the roads maintenance operations and future planning for roads infrastructure within Piedmont city limits.

This will be updated with information on grants, weekly maintenance, work orders, road conditions, short term and long term roads projects.

Latest Roads Project News;

N. Piedmont Rd. Closure

Urgent Maintenance of N. Piedmont Rd. Between Ash/220th & Moffat/234th 

  • Project Start Date; July 22nd, 2019
  • N. PIEDMONT RD. BETWEEN ASH/220TH & MOFFAT/234TH WILL BE CLOSED TO THROUGH TRAFFIC ON MONDAY JULY,22ND 2019 FOR URGENT ROAD MAINTENANCE.
  • Completion time is estimated for the evening of Monday July 22nd, 2019.
  • Detour signage will be in place to provide alternative routes.
  • Costs will be posted here once obtained.

Asphalt Work on Morgan Rd. 178th - 206th

  • Patch existing road from Edmond Rd. North to Kansas Cemetary North of 192nd Street.
  • 90.62 tons of Type C Asphalt
  • Total Cost; $13,593.00

Washout Repairs on 234th between Cemetery & Frisco Rd.

  • Pre-Bid Meeting July 2nd, 2019 at City Hall.
  • Sealed Bid Opening will be held July 12th, 2019 at City Hall.
  • Costs will be posted here once obtained.
  • As of July 17th, 2019; bids are currently being reviewed.
  • Council is set to vote on the approval of an agreed upon bid July 22nd, 2019.

Washout Repairs on Cemetery Rd. halfway between Apache & Moffat

  • Project estimated begin date; July 12th, 2019 - July 13th, 2019
  • Contract awarded to Kudron Concrete & Construction Co., L.C. by City Council on June 24th, 2019.
  • Equipment, material, and labor to construct concrete low water crossing, excavate existing tinhorn & debris, grade to subgrade.
  • Total Cost: $32,800.00

Latest Roads Project Completed;

Andy Ave. Grading

  • Completed July 2nd, 2019
  • Graded out the washed road.
  • Crew has applied 82.5 tons of 1 1/2" crusher
  • Apprx. Cost; $2,300.00

Meadowlark Lane - West of Mustang Rd.

  • Completed by Kudron Concrete & Construction Co., L.C. July 1st, 2019
  • Grinding existing surface and resurfacing with gravel.
  • Apprx. Cost; $20,000.00

Proposed Roads Projects;

Mustang Road between 164th (Washington) & 178th (Edmond Rd.)

  • Base modification, drainage structure, and resurfacing.
  • Apprx. Cost; $300,000.00-$325,000.00

Edmond Rd. Between Frisco and Western Municipal Boundary

  • Bar ditch excavation and resurfacing with gravel.
  • Apprx. Cost; $75,000.00 - $100,000.00

If you have any questions or concerns regarding roads, please call City Hall at 405-373-2621 or send an email to avossen@piedmont-ok.gov